MARTA will suspend Red and Gold Line rail service between Arts Center Station and the Buckhead and Lenox stations from 9 a.m. to noon on Sunday, December 13, 2026, for Georgia Power work above the tracks. Announced on November 13, the plan moves riders onto a bus bridge and adds about 30 minutes to trips.
Key Takeaways
- Bus bridge buses load in each station’s bus bay, except at Buckhead, where they load on Peachtree Road
- Georgia Power is replacing an outdated overhead ground wire near Piedmont Road and Miami Circle
- The wire replacement takes about an hour, and MARTA needs the rest of the window to power down, clear the tracks and restore power
- Local bus routes and Sunday schedules are unchanged, and long-term parking at Lindbergh Center stays open
- MARTA is also single-tracking on December 13 for other maintenance projects
How Will Riders Get Through the Closed Segment?
MARTA announced the suspension in a November 13 press release on the Red and Gold Line work. All Red and Gold Line riders traveling through the affected area must use a bus bridge between four stations.
- Arts Center: Bus bridge boards in the station bus bay
- Lindbergh Center: Bus bridge boards in the station bus bay
- Buckhead: Bus bridge boards on Peachtree Road
- Lenox: Bus bridge boards in the station bus bay
The buses run continuously on a load-and-go basis. MARTA staff, signs and announcements will direct riders to the boarding areas.
Local buses will still serve Lindbergh Center. Riders who arrive there by bus and plan to continue by rail must take the bus bridge to reach Red or Gold Line trains.
Three-Hour Window Covers Power-Down and Restoration
Georgia Power is replacing an outdated overhead ground wire that spans the Red and Gold Line tracks near Piedmont Road and Miami Circle. MARTA said train service must be suspended for the safety of riders and crews, and the work must be done in daylight.
The wire replacement itself is expected to take about an hour. The rest of the three-hour window gives MARTA time to cut power and clear the tracks beforehand, then restore power so trains can resume.
“The timing of this necessary work was chosen to minimize impact on customers,” MARTA said, noting that Sunday morning typically has lower ridership and no major events are scheduled for December 13.
MARTA trains run from 6 a.m. to 1 a.m. on weekends. The suspension covers three of those 19 hours of Sunday rail service.
What Stays the Same on December 13
- Local buses: Routes and Sunday schedules are unchanged
- Lindbergh Center buses: Local bus service to the station continues
- Parking: Long-term parking at Lindbergh Center remains open
Details MARTA Has Not Announced
MARTA is also single-tracking on December 13 for other maintenance projects, but it has not yet posted that day’s schedule on its special rail schedules page. The release does not describe train service north of Buckhead and Lenox during the suspension, or accessibility arrangements on the bus bridge.
Riders with questions can reach MARTA customer service at 404-848-5000 or custserv@itsmarta.com.
The rail suspension comes one day after MARTA’s December 12 Service Change Day, when six bus routes in Downtown Decatur (Routes 15, 17, 75, 114, 118 and 120) shift to new alignments along Commerce Drive.
FAQs
When Is MARTA’s Red and Gold Line Suspension?
Service is suspended from 9 a.m. to noon on Sunday, December 13, 2026.
Which Stations Are Affected?
Rail service stops between Arts Center Station and the Buckhead and Lenox stations, a segment that includes Lindbergh Center. A bus bridge serves all four stations.
Where Do Bus Bridge Riders Board at Buckhead?
At Buckhead, buses load on Peachtree Road. At Arts Center, Lindbergh Center and Lenox, they load in the station bus bays.
How Much Extra Time Should Riders Plan For?
MARTA advises riders to plan for about 30 additional minutes.
Will Lindbergh Center Parking Be Open?
Yes. Long-term parking at Lindbergh Center remains open during the suspension.




